Electronic Components Datasheet Search |
|
313874-1 Datasheet(PDF) 5 Page - TE Connectivity Ltd |
|
313874-1 Datasheet(HTML) 5 Page - TE Connectivity Ltd |
5 / 6 page 408-9393 Rev F 5 of 6 3. Insert an unstripped wire into the funnel area between the contact and the wire inserter until it bottoms on the tool base. 4. Depress the footswitch and hold it until the wire inserter bottoms. 5. Release the footswitch. The wire inserter will retract and the feed slide will automatically advance the connector to the next contact position. 6. Repeat steps 2 through 5 until all contacts have been terminated. 7. Inspect each termination. 6. MAINTENANCE AND INSPECTION DANGER To avoid personal injury, always disconnect the power bench assembly from the air supply when performing maintenance or inspection procedures. These procedures have been established to ensure the quality and reliability of the power bench assembly. A brief inspection should be made daily by the operator and a more detailed inspection should be performed on a scheduled basis by quality control personnel. 6.1. Daily Maintenance Each operator of the unit should be made aware of, and responsible for, the following procedures: 1. Remove dust, moisture, and other contaminants with a clean, soft brush, or clean, lint-free cloth. Do not use objects that could damage the power bench assembly. 2. Ensure that all components are in place and properly secured. 3. With the terminating head or feed track assembly in place, connect the air supply and actuate the power assembly by depressing and releasing the foot switch to ensure that the mechanisms and plunger move smoothly and freely. 6.2. Periodic Inspection (At Least Once a Month) Regular inspections should be performed by quality control personnel. A record of quality control inspections should remain with the power bench assembly or with personnel responsible for the assembly. It is recommended that one inspection per month be performed; however, operator training and skill, amount of use, working conditions, and established company standards are all factors to be considered in scheduling inspections. The inspections should be performed in the following sequence: 1. Remove any accumulated film with a suitable cleaning agent that will not affect plastic material. 2. Make certain that all components are in place and properly secured. Check air tube fittings for leaks. 3. Make a few test terminations and inspect the terminations in accordance with the inspection procedure described in the instructions packaged with the terminating head or feed track assembly. 4. Check for chipped, cracked, worn, or broken areas. If damage is evident, repair is necessary. See Section 8, Replacement and Repair. 7. REPLACEMENT AND REPAIR Customer-replaceable parts are listed in Figure 5. Parts other than those listed should be replaced by TE to ensure quality and reliability. For customer repair service or to order replacement parts, call 1-800-522-6752, or fax your purchase order to 717-986-7605, or write to: Customer Service (038-035), Tyco Electronics Corporation, PO Box 3608, Harrisburg, PA 17105-3608. CUSTOMER SERVICE (038-035) TYCO ELECTRONICS CORPORATION P0 BOX 3608 HARRISBURG, PA 17105-3608 or TYCO ELECTRONICS CORPORATION UK LTD BARTON TORS BIDEFORD NORTH DEVON, GREAT BRITAIN |
Similar Part No. - 313874-1 |
|
Similar Description - 313874-1 |
|
|
Link URL |
Privacy Policy |
ALLDATASHEET.COM |
Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Datasheet Upload | Contact us | Privacy Policy | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
Family Site : ic2ic.com |
icmetro.com |